CallWhatsAppFree quote

What we do

One point of contact, from the first sketch to the last detail.

All trades, from the initial study to the formal handover of the keys — new build, renovation, restoration — or just the stage you are missing.

Villa under construction in Marrakech: reinforced concrete frame and red bricks

Structural work · illustrative image

Expertise

[ 10 services ]

Every stage, under control.

Each service can be ordered on its own or as part of a turnkey project, within the same framework: itemised quote, written schedule, documented monitoring.

New build with earth-toned walls and flat roofs, behind shrubs, on a hillside in the High Atlas above the valley
01 / 10

Turnkey construction

A single point of contact from the first drawing to the handover of the keys: design study, structural work, building services and fit-out, finishing works and handover.

Architect’s table with villa plans, a white scale model and samples of tadelakt and zellige
02 / 10

Design, plans & permit

Analysis of the plot, realistic costing, and coordination of the plans and building permit with your architect, before any financial commitment.

Villa under construction in Marrakech: reinforced concrete frame and red brick walls, wooden scaffolding
03 / 10

Structural work

Earthworks, foundations, reinforced concrete frame, masonry and roofing: each stage checked before the next.

Villa at the fit-out stage: electrical conduits and plumbing pipes in brick walls
04 / 10

Building services & fit-out

Electrics, plumbing, insulation, doors and windows, and plasterwork: all the technical trades coordinated by a single point of contact.

Craftsman’s hands smoothing an ochre tadelakt wall with a stone
05 / 10

Finishing works

Floor finishes, renders, paint, sanitary ware, interior joinery and façades, through to a handover with no snags.

Riad reception room stripped back to the stone, with its zellige panelling and cedar ceiling preserved
06 / 10

Renovation & restoration

Strengthening the structure, renewing the services and restoring the finishes of an existing building, riad or house, without damaging what gives it its value. All trades, one point of contact.

Existing house being raised with a new floor in brick and concrete
07 / 10

Extension & extra floor

A new room, an extra floor or an annexe integrated with the existing house, with the work organised around your daily life.

Unfinished concrete frame of a villa with starter bars exposed, on the outskirts of Marrakech
08 / 10

Taking over a stalled build

Your build has stopped, is poorly supervised or is hard to get going again: diagnosis, technical priorities, correction of non-compliant work and restart.

Villa in ochre render at dusk, with a lit swimming pool in the foreground and the snow-capped Atlas in the distance
09 / 10

Swimming pool

Made-to-measure reinforced concrete pools, infinity or indoor, and renovation of existing pools: structure, waterproofing, filtration and finishes, with a single point of contact.

Craftsman’s hands polishing ochre tadelakt plaster with a stone
10 / 10

Home hammam

Traditional Moroccan hammam with a vault and boiler, steam generator cabin, full spa or renovation of an existing hammam: waterproofing, heating and tadelakt under control.

Method

4 phases, approved in writing.

Discover the method

Your questions

Before you start.

01Can we hire you for a single stage?

Yes. Each service can be ordered on its own (design study, structural work, building services and fit-out, finishing works, takeover) or as part of a turnkey project.

02Do you charge for the first conversation?

No. We start with a no-obligation conversation to understand your needs and point you to the right level of support.

03How is the quote drawn up?

The quote is itemised line by line: quantities, product references and unit prices, so you know exactly where your budget goes.