CallWhatsAppFree quote

Standard pool · Infinity · Indoor · Renovation

Swimming pool construction in reinforced concrete.

Made-to-measure reinforced concrete pools, infinity or indoor, and renovation of existing pools: structure, waterproofing, filtration and finishes, with a single point of contact.

Villa in ochre render at dusk, with a lit swimming pool in the foreground and the snow-capped Atlas in the distance

Service 09 / 10 · illustrative image

The service

A swimming pool is a piece of civil engineering before it is a design feature: a reinforced concrete shell that must stay watertight for years, on ground that moves with heat and watering. We treat it like the structural work of a house, with the structural engineering consultancy for the structure.

We build standard skimmer pools, infinity pools on sloping plots or terraces, indoor or covered heated pools, and we renovate pools that leak or are showing their age. Every stage is photographed, and the shell is water-tested for watertightness before the finish is applied.

What is included in this service.

  1. 01Siting and soil study with the structural engineering consultancy
  2. 02Earthworks, foundations and reinforced concrete shell, cast in formwork or sprayed
  3. 03Waterproofing of the shell and water test before the finish
  4. 04Filtration, plant room, lighting and electrics to safety standards
  5. 05Infinity edge: overflow channel, balance tank and correctly sized hydraulics
  6. 06Indoor or covered pool: heating, dehumidification and ventilation of the pool room
  7. 07Finishes: zellige, mosaic, stone, render or tadelakt, pool surrounds and copings
  8. 08Renovation: leak detection, redoing the waterproofing, finish and filtration

Price ranges in 2026.

Standard reinforced concrete pool
4,000 to 5,500 MAD per m² of pool
Example: 8 × 4 m pool
130,000 to 180,000 MAD
Infinity pool, balance tank included
5,500 to 8,000 MAD per m² of pool
Indoor or covered heated pool
30 to 60% more than an outdoor pool
Plant room
15,000 to 30,000 MAD
Heat pump
20,000 to 40,000 MAD
Renovation: waterproofing and finish
1,000 to 2,500 MAD per m² of finished surface

Indicative prices incl. VAT observed in Marrakech in 2026, excluding land and professional fees. Only an itemised quote is binding. All price ranges

Who it is for

[ Your situation ]

This service is for you if…

01

You are building your villa

The pool is planned from the drawings stage: services, plant room and machinery access are designed together with the structural work.

02

Your plot slopes

An infinity edge makes use of the slope; the balance tank and hydraulics are sized at the design stage.

03

Your pool leaks or is ageing

We locate the leaks, redo the waterproofing and the finish, and bring the filtration up to standard.

Method

The same framework, for every service.

The method in detail
  1. 01Brief and budgetYour priorities, your budget, the plot.
  2. 02Plans and costingFirm quote, line by line.
  3. 03Monitored constructionShared schedule, online photo reports.
  4. 04HandoverJoint inspection, signed handover report.

FAQ

Swimming pool: your questions.

01Do I need a permit to build a swimming pool?

Yes, a swimming pool is among the works that require a permit: it is included in the villa’s building permit, or covered by an application to the municipality if it is added later. Your architect checks what your municipality requires before work starts.

02How long does the build take?

Generally allow two to three months for a standard pool, longer for an infinity or indoor pool. The schedule is set in the quote and tracked visit by visit.

03Which finish should I choose?

Zellige is traditional and durable, but needs careful laying and joints suited to treated water. Mosaic and stone give other looks; render is more economical. We show you samples before ordering.