CallWhatsAppFree quote

Floor and wall finishes · Tadelakt · Paint · Façades

Finishing works: the care that makes the difference.

Floor finishes, renders, paint, sanitary ware, interior joinery and façades, through to a handover with no snags.

Craftsman’s hands smoothing an ochre tadelakt wall with a stone

Service 05 / 10 · illustrative image

The service

Finishing works are what separate a house that works from a house that is done well. We give the details the same care as the structure.

You choose materials and finishes from samples; each choice is documented and priced before the work is carried out, for a handover with no snags.

What is included in this service.

  1. 01Floor finishes (tiles, polished concrete, wood flooring)
  2. 02Interior and exterior painting
  3. 03Sanitary ware and taps
  4. 04Interior joinery (doors, built-in wardrobes, mouldings)
  5. 05Façades, renders and exterior roughcast

Who it is for

[ Your situation ]

This service is for you if…

01

The structure is there, but the house is not ready to live in

We complete, correct and inspect the work through to a clean handover.

02

Before a handover or letting the property

Quality control and clearing of the snag list before the key date.

03

A refresh

Redoing the renders, paintwork and floor and wall finishes of an existing house.

Method

The same framework, for every service.

The method in detail
  1. 01Brief and budgetYour priorities, your budget, the plot.
  2. 02Plans and costingFirm quote, line by line.
  3. 03Monitored constructionShared schedule, online photo reports.
  4. 04HandoverJoint inspection, signed handover report.

FAQ

Finishing works: your questions.

01Can we hire you for the finishing works only?

Yes, that is the “Finishing before handover” pack: finishing works, corrections, quality control and a clean handover.