Analysis of the plot, realistic costing, and coordination of the plans and building permit with your architect, before any financial commitment.

Architect’s table with villa plans, a white scale model and samples of tadelakt and zellige

Service 02 / 10 · illustrative image

The service

Every successful project starts with a thorough analysis. We study your plot, your needs and your budget so that, with your architect, we can define clear plans and a realistic cost estimate before any financial commitment.

The plans are drawn up by the architect (your own or one of our partner architects), in several rounds approved with you. Once the volumes are fixed, we produce a firm, itemised quote and coordinate the building permit application, which the architect signs and submits.

What is included in this service.

  1. 01Analysis of the plot and regulatory constraints
  2. 02Sketches and site plans, with the architect
  3. 03Detailed architectural drawings by the architect (sections, elevations, floor plans)
  4. 04Itemised quote, line by line
  5. 05Coordination of the building permit application with the architect

Who it is for

[ Your situation ]

This service is for you if…

01

You have an idea, but no reliable budget yet

The study turns an intention into a costed project, with clear assumptions.

02

You want to compare before signing

An itemised quote lets you understand every line and make an informed decision.

03

You are starting with the plans only

You can stop at this stage: the works are organised once everything is approved.

Method

The same framework, for every service.

The method in detail
  1. 01Brief and budgetYour priorities, your budget, the plot.
  2. 02Plans and costingFirm quote, line by line.
  3. 03Monitored constructionShared schedule, online photo reports.
  4. 04HandoverJoint inspection, signed handover report.

FAQ

Design, plans & permit: your questions.

01How long does this phase take?

Generally allow 3 to 6 weeks for the plans and costing, depending on the number of revisions and the complexity of the project.

02Do you work with an architect?

Yes. The building permit application is signed by an architect; we coordinate with them so that the permit is granted before ground is broken.