About us
The door, and those who build it.
Multi-Service de Marrakech Junior works with private clients who are building, extending or taking over their house, anywhere in Morocco — with a single point of contact and written commitments.

Illustrative image
Our symbol
A Marrakech arch, with a maalem at its heart.
Our symbol draws a door — the bab of the Marrakech ramparts — and, at its heart, the silhouette of a man: the worker, the maalem, the traditional master craftsman. They are the pride of Multi-Service de Marrakech Junior.
Junior stands for a new generation of construction company. We are young, and that is precisely why everything is written down, dated and verifiable: our first builds — a riad in a medina and a project in the High Atlas — are progressing with an architect, a structural engineering consultancy and a technical inspection firm, and every visit is documented in the client’s online area.
“Multi-Service”, because we handle all trades: masonry, structure, services, plaster, wood, metal, floor and wall finishes, from a riad to restore to a new villa. This arch appears throughout this site: it is through it that you look at our builds. Our role is to put this craftsmanship into a clear framework — a quote you understand, a schedule you can follow, decisions you can find again, and a handover we sign together.
Four verbs, one framework.
Write
What is not written down does not exist. Quote, schedule, decisions, snags: everything is recorded and shared.
Show
At every visit, you see the actual progress of your build, with photos, in your online area.
Approve
Nothing moves forward without your agreement. Every expense is approved before it is committed.
Hand over
When the keys are handed over, you receive a complete file: plans, manuals, guarantees.

What we commit to doing
Commitments, not promises.
- 01Itemised quote, line by line
- 02Written schedule, dated milestones
- 03Photo progress report at every site visit
- 04Decisions approved in writing
- 05Traced materials
- 06Joint handover inspection
- 07Signed handover report
Where we work
All of Morocco, from Marrakech.
We work across Morocco, in towns and in the countryside, from our head office in Marrakech. Tell us the municipality where your plot is located: we will confirm whether we are available.
- All of Morocco
- In towns and in the countryside
- Head office in Marrakech
31°37′N · 7°59′W