
Your contractor has disappeared mid-build: what should you do?
2 April 2026
Diagnosis · Corrections · Restart
Your build has stopped, is poorly supervised or is hard to get going again: diagnosis, technical priorities, correction of non-compliant work and restart.

Service 08 / 10 · illustrative image
The service
A contractor who disappears, work at a standstill, deposits already paid: it is one of the most stressful situations a private client can face.
We take on builds that are already under way, after a diagnosis. We check the existing condition, set the technical priorities and the corrections needed, then restart the build within a written framework.
The contractor no longer responds or work has been stopped for weeks.
You have doubts about the quality of what has been done.
You want to resume with a clear framework and full documentation of the existing work.
FAQ
Yes, after a diagnosis. We check the existing condition, the technical priorities and the corrections needed before resuming.
Document the situation (messages, payments, dated photos) and have the condition of the site formally recorded. Our guide on what to do when a contractor abandons the build sets out the steps.

Earthworks, foundations, reinforced concrete frame, masonry and roofing: each stage checked before the next.

Floor finishes, renders, paint, sanitary ware, interior joinery and façades, through to a handover with no snags.

A single point of contact from the first drawing to the handover of the keys: design study, structural work, building services and fit-out, finishing works and handover.