Electrics · Plumbing · Insulation · Doors and windows
Building services and fit-out: seamless coordination.
Electrics, plumbing, insulation, doors and windows, and plasterwork: all the technical trades coordinated by a single point of contact.

Service 04 / 10 · illustrative image
The service
Building services and fit-out bring your house to life. This is where the comfort, safety and durability of the installations are decided.
We coordinate all the technical trades to ensure consistency and quality wherever one trade’s work meets another’s, and so that nothing is closed up before it has been checked.
What is included in this service.
- 01Electrics (distribution board, wiring, sockets, lighting)
- 02Plumbing (cold water, hot water, drainage)
- 03Thermal and acoustic insulation
- 04External joinery (doors, windows, shutters)
- 05Plasterwork and internal partitions
This service is for you if…
Structure complete
Your structural work is finished: we take over the technical trades.
Several tradespeople to coordinate
A single point of contact avoids clashes between the electrician, the plumber and the joiner where their work meets.
Renovation
Bringing the wiring and plumbing of an existing house up to standard.
- 01Brief and budgetYour priorities, your budget, the plot.
- 02Plans and costingFirm quote, line by line.
- 03Monitored constructionShared schedule, online photo reports.
- 04HandoverJoint inspection, signed handover report.
FAQ
Building services & fit-out: your questions.
01Are the services checked before they are closed in?
Yes. Wiring and pipework are inspected and photographed before chases and partitions are closed, so there is a record of what is embedded in the walls.
You might also need…

Finishing works
Floor finishes, renders, paint, sanitary ware, interior joinery and façades, through to a handover with no snags.

Structural work
Earthworks, foundations, reinforced concrete frame, masonry and roofing: each stage checked before the next.

Turnkey construction
A single point of contact from the first drawing to the handover of the keys: design study, structural work, building services and fit-out, finishing works and handover.
