CallWhatsAppFree quote

Traditional hammam · Steam · Spa · Renovation

Hammam and spa at home.

Traditional Moroccan hammam with a vault and boiler, steam generator cabin, full spa or renovation of an existing hammam: waterproofing, heating and tadelakt under control.

Craftsman’s hands polishing ochre tadelakt plaster with a stone

Service 10 / 10 · illustrative image

The service

The hammam is the most demanding room in a house: steam and heat put the waterproofing, the ventilation and every finish to the test. A defect that is invisible on day one becomes water ingress or render coming away a few months later.

We build traditional hammams with a vault, bench and boiler, steam generator cabins that fit into a bathroom, full spas with a relaxation room and showers, and we renovate existing hammams. Mason, plumber, electrician and the master craftsman (maâlem) for tadelakt or zellige are coordinated as one team.

What is included in this service.

  1. 01Design with the architect: volume, vault, bench, ventilation and plant room
  2. 02Waterproofing under tadelakt or tiles, vapour barrier, falls and drainage
  3. 03Heating: wood or gas boiler for a traditional hammam, or an electric steam generator
  4. 04Heated bench and floor, vaulted or sloping ceiling to stop drips
  5. 05Finishes: tadelakt, zellige, marble or stone, waterproof taps and lighting
  6. 06Full spa: relaxation room, showers, changing room and, if wanted, a jacuzzi or pool
  7. 07Renovation: tracing water ingress, redoing the waterproofing, tadelakt and heating
  8. 08Water softener recommended to protect the generator from limescale

Price ranges in 2026.

Steam generator cabin, 4 to 6 m²
30,000 to 60,000 MAD
8 to 12 m² hammam with bench and tadelakt
60,000 to 120,000 MAD
Traditional hammam with vault and boiler
100,000 to 200,000 MAD
Full spa
200,000 to 500,000 MAD or more
Renovation of an existing hammam
25,000 to 80,000 MAD
Steam generator only
5,000 to 25,000 MAD

Indicative prices incl. VAT observed in Marrakech in 2026, excluding land and professional fees. Only an itemised quote is binding. All price ranges

Who it is for

[ Your situation ]

This service is for you if…

01

You are building or renovating a villa or a riad

The hammam is planned from the drawings stage: services, drainage, flue or plant room are built into the structural work.

02

You want a hammam in a bathroom

A steam generator cabin fits into four to six square metres, with a plant room close by.

03

Your hammam is deteriorating

Render coming away, damp marks, weak heating: we find the cause before redoing the finishes.

Method

The same framework, for every service.

The method in detail
  1. 01Brief and budgetYour priorities, your budget, the plot.
  2. 02Plans and costingFirm quote, line by line.
  3. 03Monitored constructionShared schedule, online photo reports.
  4. 04HandoverJoint inspection, signed handover report.

FAQ

Home hammam: your questions.

01How much space is needed?

A steam generator cabin fits into four to six square metres. A hammam with a bench and a scrub area ideally needs eight to twelve square metres, plus a plant room nearby for the generator or the boiler.

02Boiler or steam generator?

A wood or gas boiler gives the heat of a traditional hammam, and needs space and a flue. An electric generator is compact and heats up quickly; its output is calculated from the volume of the room, and a water softener protects it from limescale.

03Does tadelakt hold up in a hammam?

Yes, it is the traditional hammam plaster, provided it is applied to a sound, watertight substrate and maintained with black soap. On a damp or cracked substrate it eventually comes away: hence the waterproofing test before it is applied.