How much does it cost to build a house in Morocco in 2026? Price ranges per m², from villa to hammam
10 October 2026

One point of contact, from the first plan to the handover of the keys. Written commitments on price, timescales and materials.
Building a house is a commitment for life. We make ours in writing: an itemised quote, a dated schedule, a photo report at every visit and a signed handover. Nothing moves forward without your approval.
All trades, from bare plot to the handover of the keys, from a riad to restore to a new villa: each service can be ordered on its own or as part of a complete project.
All servicesBuilding takes trust. We make it tangible with checkpoints, a schedule set out in advance and a structured handover.
01
dedicated contact person, reachable directly
04
phases approved in writing before moving on to the next
02
schedules tracked task by task: the official one and the site manager’s
100%
of quote items broken down: quantities, references, prices
Structural work — reinforced concrete frame · illustrative imageEach phase is documented and approved with you before moving on to the next. No surprises along the way.
The method in detailWe set your priorities, your budget and the constraints of the plot.
Feasibility analysis
You approve the volumes, the materials and an itemised quote, line by line.
Firm quote · permit coordinated with the architect
The build progresses according to a shared schedule, with milestones and alerts.
Online photo reports
Every detail is checked jointly with you before the keys are handed over.
Signed report · your keys
Our services are grouped into clear packs: you know what you get, when to use it and how to move towards a clear quote.

Pack · the most complete
You want a single point of contact so the build is not split between many parties.
Deliverable Structural work, fit-out, finishing works, schedule and handover.
Find out moreYou have a plot or an idea, but no reliable budget yet.
Deliverable Plans, technical scope and an itemised quote before you commit.
The build has stopped, is poorly supervised or is hard to get going again.
Deliverable Diagnosis, priorities, correction of non-compliant work and restart.
The structure is there, but the house is not ready to live in.
Deliverable Finishing works, corrections, quality control and a clean handover.

Moroccans living abroad · Expats
You do not have to rush to the site to find out how it is going. Everything is written down, dated and photographed.
Your build online
Every client has personal access to our monitoring platform. No screenshot here: our clients’ data is confidential. Here is what you will find there.
Your build
Overall progress
42%
Our first two builds in progress, published with our clients’ consent, and the projects we take on.
View our projects
01 — Rabat medina · in progressRestoring a riad
02 — High Atlas · final phaseCommunity centre
03 — New house · illustrationContemporary villa
04 — Structural work · illustrationReinforced concrete frame
05 — Takeover · illustrationBuild taken overPhotos of our builds in progress, published with our clients’ consent · the other images are illustrations.

Finishing works · Handover
Handing over the keys is a formal step, not a symbolic gesture.
Joint inspection, signed handover report, snags cleared and a complete file handed over before the keys change hands.
Yes. We can begin with the design study, sketches and costing, then organise the works once everything is approved.
Yes. Each item is listed separately with quantities, product references and unit prices, so you know exactly where your budget goes.
The build starts with a schedule by phase. Milestones are tracked, and any adjustments are communicated before they hold up the work.
Yes, after a diagnosis. We check the existing condition, the technical priorities and the corrections needed before resuming.
Yes. Online, you can see the photo report of every site visit, the schedule, updated continuously, and the decisions approved in writing. A dedicated contact person can be reached directly.
In instalments, set out in the contract and linked to the progress verified on site. No instalment is called before the corresponding stage has been completed and can be checked.
Any delay is explained with a written reason (bad weather, additional works requested, a delivery…) and a new date is set. The online schedule shows it immediately.
Yes. We carry out your architect’s plans and work with them, the structural engineering consultancy and, depending on the project, the technical inspection firm and the testing laboratory. If you do not have an architect, we introduce you to our partners.
We work in Marrakech and the surrounding region, and elsewhere in Morocco depending on the project. In your request, tell us the municipality where your plot is located: we will quickly confirm whether we are available.